CHAPTER HALL
Client
- Trustee of Roman Catholic Church:
Catholic Education Department
Value
- $115,000
Key Features
- Excavation in confined spaces
- Use of conveyors for spoil removal
- Works within heritage building
Referees
-
Catholic Church:
Robert Whitby
T: 9390 5100
John Graham & Associates:
John Graham
T: 9241 4688
Description of Works
-
Ford Civil Contracting were engaged to excavate a subfloor within Chapter Hall – Part of the St Mary’s Cathedral, Sydney.
-
Chapter Hall is a listed heritage building and subfloor excavation had to avoid any disturbance to existing footing and building structure.
-
Access was only via a 1.4m wide doorway which restricted works to a 1.5t Excavator. Spoil was removed from within the building via a series of conveyor belts through the narrow doorway.
-
The project was delivered well ahead of programme with no damage to the heritage building.