POTTS POINT DEEP SHAFT & TUNNEL EXCAVATION
Client
Value
Key Features
- Demolition
- Asbestos removal
- Bulk Excavation
- suspended reinforced concrete road slab
- Shotcrete walls
- Temporary anchors
- Tunnel excavation within bulk footprint
Referees
Description of Works
- Sensitive Demolition and Excavation works within a residential neighbourhood, with no disruption to the amenity of the surrounding residents.
- This project included asbestos removal, as well as general site clearance (the removal of a number of mature trees) as well as a horizontal tunnel excavated from within the site footprint via horizontal line drilling.