STOCKLANDS MERRYLANDS
Client
- St. Hilliers
Value
- $3.7 MILLION
Key Features
- Bulk Excavation of Asbestos Contaminated Spoil
- Shoring Works
- Detail Excavtaion
Referees
-
Ian Napper
T: 9259 5200
M: 0415 390303
Description of Works
-
The works required excavation and removal of potentially asbestos contaminated spoil from a site being a previous tip with uncontrolled filling.
-
Shoring was necessary to all boundaries consisting of anchored soldier piles with intermediate shocrete or precast panels.
-
Finally, after piling works detailed excavation and slab preparation was carried out .










